Supply Chain Case Studies
Case Studies - Product
Our
production planning software has been used by many satisfied
manufacturing companies. Below, you'll find two case studies
of companies who have used this software to solve specific
problems with their manufacturing and supply chain systems.
Managing Production Bottlenecks @ Kumaran Fishnets Abstract: Kumaran
Fishnets is one of India's leading manufacturers of nylon fishing nets
to India and neighbouring regions. But the demand for their products is
seasonal and human knitting of nets, which is a critical part of
their production process, is an extremely slow bottleneck. This case
study explores how Planvisage and Kumaran applied more efficient
planning to reduce the effects of a bottleneck. Approx. Reading Time: 8-12 minutes Formats Available: Case Report (2 page PDF) and Presentation Slides (20 page PDF) Where To Download: Report Here and Presentation Here
Inter Department Planning Coordination @ Flowlink System Abstract: Flowlink
systems is a leading manufacturer of castings and valves in Coimbatore,
India. But their entire production process was distributed between
different departments - and the lack of coordination between these
departments led to delays and losses. This case study discusses how
Planvisage and Flowlink utilized more efficient planning to make
Inter-department planning easier. Approx. Reading Time: 6-10 minutes Formats Available: Case Report (2 page PDF) and Presentation Slides (15 page PDF) Where To Download: Report Here and Presentation Here Planvisage Hardware Technical Overview @ CPC - Casting To Perfection Abstract: This case study examines the hardware
& software requirements and the behind the solution Planvisage
implemented for CPC (Casting To Perfection Ltd). A large part of the
case study also contains comparisons of specifically how the production
planning process flow changed for the sales, marketing, production,
planning and purchasing departments. Approx. Reading Time: 6-10 minutes Formats Available: Case Report (3 page PDF)
Where To Download: Report Here
Case Studies - Services
We
worked exhaustively with large clients to implement custom SCM
solutions. One of our largest clients is Motorola, and here are case
studies of a few projects we've worked on. Product Launch Challenges @ Motorola Abstract: Motorola
is a Fortune 100 company with offices around the world.Motorola
frequently launches products globally across its different sites.
Unfortunately, product launches are unpredictible and demand can fall
or rise without warning. Motorola engaged Planvisage to optimize and
standardize their product launch processes across the globe. Approx. Reading Time: 10-14 minutes Formats Available: Case Report (3 page PDF) and Presentation Slides (19 page PDF) Where To Download: Report Here and Presentation Here Rough Cut Capacity Planning @ STATS Chip PAC Abstract: This case
study examines how one semiconductor supplier struggled with the
complex constraints of capacity planning before using Planvisage's
solution. Upon adopting this solution, STATS Chip PAC have realized how
they can use their resources better, have better situation visibility
for management and provide more accurate customer due dates. Approx. Reading Time: 6-8 minutes
Formats Available: Case Report (3 page PDF) and Presentation Slides (15 Page PDF)
Where To Download: Report Here and Presentation Here Site Production Planning @ Motorola Abstract: Although Motorola manufactures a multitude of products over several global sites, most sites face the same production planning challenges. Demand/Supply situation changes rapidly, customers require accurate order commitments
and their MRP/APS couldn't handle real-time, complex situations.
Motorola engaged Planvisage to improve and standardize these processes
across sites. Approx. Reading Time: 10-12 minutes Formats Available: Case Report (3 page PDF) and Presentation Slides (15 page PDF) Where To Download: Report Here and Presentation Here Order Book Visibility @ Motorola Abstract: Motorola
is one of the world's top electronics manufacturers. In 2006, their
revenues stood at $42.9 billion. Motorola captured orders of different
products across multiple ERP systems at different locations. But these
orders lacked visibility to the team that actually mattered -
production planning and fulfillment. Planvisage was engaged to provide
real-time visibility of all orders at production site level. Approx. Reading Time: 6-10 minutes Formats Available: Case Report (2 page PDF) and Presentation Slides (14 page PDF) Where To Download: Report Here and Presentation Here
After reading these case studies about our production planning software, are you ready to take the next step? Learn more about the software here, or download a 21 day downloadable trial here.
|