What is Shop Floor Scheduling
Sep 23 2019 0

What is Shop Floor Scheduling ?

Shop floor management includes the strategies and systems wont to rank, track, and report against production orders and schedules. It includes the procedures wont to value current resource standing, labor, machine usage, and alternative data needed to support the general designing, scheduling, and cost accounting systems associated with workplace operation. workplace management usually calculates add method supported a share of completion for every order and operation that’s helpful in inventory valuations and materials designing.Shop floor management might also embrace characteristic and assessing vulnerabilities and risks because of the workplace surroundings, employees, process, and therefore the technologies utilized at the shop-floor level. supported the assessment of those factors, workplace management initiates measures to stay risk at an appropriate minimum level.Shop floor management is accountable for the elaborated management of activities and therefore the flow of materials within the plant, as well as staff, materials, machines, and production time. workplace management activity usually begins when coming up with  once planned, orders and buy requisitions area unit created. workplace management attends to the subsequent functions

(sequentially):

  • Planned orders
  • Conversion of planned orders to process/production
  • Production and method order programming
  • Capacity needs coming up with
  • Material convenience assessment
  • Release of production/process orders
  • Material withdrawals
  • Order confirmations
  • Goods receipt documentation
  • Order settlement

Shop Floor Types

The shop floor types can be understood from the following perspectives

Product Quantity Perspective

There are two types of this perspective that implies in what quantity the product is manufactured

Mass Production-Mass production involves producing of the standardized merchandise with efficiency in giant quantities. this can be additionally referred to as as flow production or continuous production. The look floors for production square measure equipped with assembly lines, machinery and power at an outsized scale.

Scant Production-It involves making the merchandise during a sufficient variety. it’s additionally referred to as small-volume production.

Process Perspective

Process perspective is concerned with how the final product is made. Following are the basic types of process perspective

Assembly −On this workplace, the parts square measure assembled to manufacture a product. These parts square measure already factory-made and may be directly utilized as a district of another product. These form of look floors have assembly lines and a linear movement of the merchandise. The employees exchange that order and perform operation on the merchandise. as an example, automotive producing, electrical or equipment producing look floors.

Analytical Process −It involves breaking of a basic stuff into parts, which might be used severally. as an example, a plant breaks down fossil fuel to urge aviation fuel, gasoline, diesel, and fossil fuel wax.

Synthetic Process −It involves mistreatment varied raw materials or different product to manufacture an honest quality product. as an example, Shampoo, paints and varied cosmetic product producing.

Processing −because the name suggests, it involves process of raw or semi-raw materials through varied stages to manufacture a superior product. the fabric changes its type and look whereas undergoing process. The process workplace contains significant machinery and skilled employees at every stage. as an example, textile and cheese producing look floors.

Components of a Shop Floor

Here are some important components of a shop floor

Material −This is either a semi synthetic material or a natural resources. Material could be a very important half that is employed to form or develop some product.

Machinery, Equipment and Tools −looking on the world of production, there square measure varied mechanical, electrical, electronic and thermal instrumentality beside varied tools used on the work. This issue quickens the assembly and improves productivity of the business.

Information Technology − Today’s look floors square measure equipped with workplace management Systems (SFC), producing Execution Systems (MES), producing Operations Management (MOM) software system, Quality Management software system (QMS), Real Time information Retrieval from workplace operations, and different such simulators.

Quality Control − once the merchandise is prepared, it’s needed to endure bound quality tests and criteria to satisfy client satisfaction. the standard management Section of a store floor ensures that the merchandise is perfect and up to the customer’s satisfaction.

Store area − It stores spare elements and different such inventories. If there’s associate acceptable store area layout, its management is shrewd and there square measure correct SOPs in situ, it’ll definitely scale back operational prices to quite a extent. associate up-to-date store helps to predict the budget accurately.

Staff − proficient and old employees may be a nice contributor to sure-fire production on the workplace. Such employees will work with stripped errors and most perfection.

 Objectives of Shop Floor Management

  • Ensure proper routing movement of material on the shop floor
  • Channelize the procedures and processes for optimum output
  • Schedule operations and resources
  • Find deviation or flaw from standard procedures
  • Identify shortcomings in communication

Shop Floor Benefits

  • Bar Coded look Packets and choose Lists
  • Automatic Printing of Drawings and Work directions
  • Backflush Materials by Operation
  • Material Shortage Management
  • Drill-Downs to any or all Activities according
  • Track WIP by Operation Hours, Status, and amount Completed
  • Finite and Infinite planning with a alternative of techniques such as: Forward planning, Backward planning, Parallel planning, Offset (Repetitive) planning, Overlap planning

Key Features Of Shop Floor Solution

  • Graphical display of schedules orders using Gantt Chart
  • Manually move scheduled orders by drag and drop
  • Ability to lock a schedule
  • Different strategies for scheduling like minimize WIP or maximize resource utilization
  • Schedule resource by resource or order by order
  • Ability to see the links between upstream and downstream operations graphically
  • Respects resource constraints like working time, setup time, wait time, min queue time and transfer batch quantity
  • Model sequence dependent setup time

 

 

 

 

You Might Also Like